Projects
Over the last 5 years
-
City of Redwood City | Install 12 flow meters and 2 rain gauges for a period of 2 months
-
City of Emeryville | Inspect and map 134 storm drain structures
-
City of Santa Rosa | Repair and Calibrate 3 flow meters
-
City of Halfmoon Bay | Repair and Calibrate 4 flow meters
-
Hach for City of Los Angeles | Move and Install 25 flow meters
-
Hach for City of Los Angeles | Install 50 level meters
-
Hach for City of Los Angeles | Install 186 flow meters and performed maintenance
-
Summer Hills Homes | Install 2 flow meters for 2 weeks and do a capacity study
-
San Bruno | Sewer capacity study
-
El Cerrito Stege Sanitary District | Install 2 flow meters for 2 weeks and perform a sewer capacity study
-
EBMUD | Smoke testing sewer lines looking for cracks, breaks, and illicit connections 150,000 LF
-
South San Francisco Beacon | Install 2 flow meters for 2 weeks and perform a sewer capacity study
-
San Jose | Flow metering study 10 Meters
-
Oro Loma Sanitary District | Install 36 flow meters and 4 rain gauges
-
IBM | Flow meter maintenance
-
City of Oakland | Flow metering, structural Inspection and smoke testing
-
Alameda County | Parking lot runoff study for NPDS permitting and biofiltration system